Contractor invoice examples in English

Compare lawn care, roofing, flooring and painting invoices. Check quantities, rates and illustrative tax, open English PDF examples, or edit the same line items.

On this page
Fictional example · English invoice
Verde Yard Co.Mateo Rivera120 Example Lane, Austin, TX 78701(512) 555-0142hello@verdeyard.example
INVOICEInvoice #: VY-1042Date: 09/07/2026Due: 2026-09-21
BILL TOLuis Torresluis.torres@example.com | (512) 555-0168 | 240 Sample Drive, Austin, TX 78704
PAYMENT TERMSNet 14
Invoice line items and amounts in US dollars
DescriptionQtyRateAmount
Lawn mowing service1$75.00$75.00
Branch removal service1$40.00$40.00
Mulch delivery (6 bags)6$8.00$48.00
Subtotal$163.00Tax (8.25%)$13.45Total due · USD$176.45

Thank you for your business.

Fictional amounts with an illustrative 8.25% tax rate. Confirm the taxes and terms for your job; this rate is not universal. Fill in the template manually; totals do not calculate automatically.

Try the line items from this invoice

Change quantities, rates and received payments. This replaces the current worksheet entries; use “Restore my previous entries” to recover them.

Load this example in the worksheet
Check the amounts for your template

Calculate up to 12 line items in US dollars before entering the totals in the PDF. Your entries stay on this page and disappear when you close or reload it. Use the print preview to keep the breakdown.

Loading an example replaces the current line items and amounts.

Use a decimal point or comma, without thousands separators. Quantities: up to 3 decimals; rates: up to 2. The description is for your reference; this tool does not translate it.

8.25% is the rate selected for these examples, not a rate for every job. Enter the rate you have confirmed. This calculation applies one rate to the subtotal less the discount; it does not separate exempt items.

Count the money you have already received, including any deposit, once. A pending payment request is not money received.

Invoicista · USD

Amount-checking worksheet

Keep this breakdown to check the amounts when filling in your document. In the print dialog, choose a printer or the save-as-PDF option available in your browser.

Line items and prices in US dollars
Service or materialQuantityUnit rateAmount

This is a reference calculation worksheet, not an invoice or proof of payment. Descriptions stay in the language in which you entered them.

One tax rate applies to the subtotal less the discount. Confirm the rate and which items it applies to before preparing your invoice.

This preview is prepared in your browser. You choose where to print it or save the file.

How to fill in and save the template

  1. Download the PDF and save a copy for each job. Open it in a PDF reader that supports fillable forms.
  2. Fill in your business name and contact details, customer and dates. Add up to 12 line items with short English descriptions, quantities and rates.
  3. Calculate quantity × rate for each line. Subtotal less discount plus tax gives Invoice total; subtract received payments to get Balance due. Enter the tax rate and amount you have confirmed. The PDF does not calculate automatically.
  4. Save the file, close it and reopen it to check that the fields and amounts were saved. Check that the full business name and every line item are visible in the copy you will send.

Check amounts on this page ↑

Cannot type in the fields? Download the file instead of using the chat preview, then open it in a reader that supports forms.

EXCEL TEMPLATE

Line items and balance calculate for you.

Enter up to 12 services, quantities and rates. Add a fixed discount and the applicable tax amount; the file calculates the total and subtracts payments received. The invoice is in English; Help includes Spanish, English and Portuguese instructions.

Download Excel template

XLSX for Excel. Save a copy, fill in Invoice and export only that sheet as a PDF for your customer.

View the calculated example

Example uses fictional details: subtotal 163.00, illustrative tax 13.45 (8.25%), total 176.45, received 40.00 and balance 136.45 USD. Confirm the tax rate for your job. Invoice starts without services.

What each field tells your client

  1. Bill to identifies the customer. Add the correct name and job address.
  2. Description explains the work and materials. Six bags of mulch at $8 each add up to $48.
  3. Total due is the amount still owed. Confirm tax, previous payments and the terms you agreed.

Compare with a job like yours.

Open a roofing, flooring, painting or handyman example. Review the scope and unit rates, open its English PDF, or load the same line items in the worksheet above. All details and amounts are fictional.

Roofing · leak repair and shingles

ONE JOB, WORKED THROUGH

One roof repair, twelve shingles and a single debris charge.

How to describe the job

We repaired a leak in the garage roof and replaced twelve asphalt shingles. Labor costs 325 dollars for the whole job. The twelve shingles cost 5 dollars each, and job debris removal costs another 25 dollars. Full roof replacement and wood decking repairs are not included.

Illustrative example with fictional details. These amounts explain the calculation; they are not a price guide.

The English line items

Fictional invoice line items and amounts in US dollars
DescriptionQtyRateAmount
Garage roof leak repair and shingle replacement - labor1$325.00$325.00
Replacement asphalt shingle - material per shingle12$5.00$60.00
Job debris removal1$25.00$25.00
Subtotal
$410.00
Illustrative tax · 8.25%
$33.83

Example total · USD$443.83

This example applies 8.25% tax to the whole subtotal. Confirm the tax rate and taxable items for your own job.

What to check before sharing

  1. One labor charge for the repair

    The $325 labor charge covers the whole leak repair in this example. Quantity 1 means one agreed job; it is not $325 for each shingle.

  2. Materials priced per shingle

    Twelve replacement shingles at $5 each cost $60. Keep this material charge separate from the labor already agreed for the job.

  3. Debris removal and exclusions

    One $25 charge covers removing the repair debris. The fictional subtotal is $325 + $60 + $25 = $410. Full roof replacement and wood decking repairs are outside this scope.

Check and change the amounts for this case →

Flooring · area and transition strips

ONE JOB, WORKED THROUGH

The same floor area, separate labor and material rates.

How to describe the job

We installed 120 square feet of click-lock vinyl flooring at 2 dollars and 75 cents per square foot for labor. We supplied the vinyl at 1 dollar and 85 cents per square foot for that same area. Two transition strips cost 18 dollars and 50 cents each. Existing floor removal and subfloor repairs are not included.

Illustrative example with fictional details. These amounts explain the calculation; they are not a price guide.

The English line items

Fictional invoice line items and amounts in US dollars
DescriptionQtyRateAmount
Click-lock vinyl plank installation - labor per sq ft120$2.75$330.00
Vinyl plank flooring supplied - material per sq ft120$1.85$222.00
Floor transition strip - each2$18.50$37.00
Subtotal
$589.00
Illustrative tax · 8.25%
$48.59

Example total · USD$637.59

This example applies 8.25% tax to the whole subtotal. Confirm the tax rate and taxable items for your own job.

What to check before sharing

  1. Labor measured by area

    Installing 120 square feet at $2.75 per square foot costs $330. The quantity represents floor area, not hours, rooms or packs of vinyl.

  2. Materials for that same area

    The 120 square feet of vinyl at $1.85 per square foot cost $222. Labor and material use the same area with separate unit rates; do not add another full floor charge.

  3. Transitions priced per piece

    Two transition strips at $18.50 each add $37. The fictional subtotal is $330 + $222 + $37 = $589. Existing floor removal and subfloor repairs are excluded.

Check and change the amounts for this case →

Painting · walls and trim

ONE JOB, WORKED THROUGH

Two coats on one room, with trim measured separately.

How to describe the job

Paint the primary bedroom walls with two coats: 420 dollars for labor. Paint and protective materials cost 95 dollars. Forty linear feet of trim at 2 dollars and 25 cents per foot. Wall repairs are not included.

Illustrative example with fictional details. These amounts explain the calculation; they are not a price guide.

The English line items

Fictional invoice line items and amounts in US dollars
DescriptionQtyRateAmount
Primary bedroom wall painting - two coats, labor1$420.00$420.00
Paint and protective materials1$95.00$95.00
Trim painting - linear feet, labor40$2.25$90.00
Subtotal
$605.00
Illustrative tax · 8.25%
$49.91

Example total · USD$654.91

This example applies 8.25% tax to the whole subtotal. Confirm the tax rate and taxable items for your own job.

What to check before sharing

  1. Two coats within one service

    The $420 labor charge already includes two coats on the bedroom walls. Quantity 1 represents the agreed service; multiplying it by two would charge for the coats again.

  2. Trim measured by length

    Forty linear feet of trim at $2.25 per foot cost $90. Use linear feet for that line; square feet would describe a different measurement.

  3. Materials and wall repairs

    The $95 charge for paint and protection is separate from labor. Wall repairs are excluded. The fictional subtotal is $420 + $95 + $90 = $605.

English PDF · 8 line items with units · Manual totals

Check and change the amounts for this case →

How to fill in the painting template
Preview of the fillable painting invoice: surfaces, finish, eight line items with units and balance.
Open PDF template ↗Download fillable template ↓

The blank PDF has 8 line items with a separate unit column. Enter the scope and prices you agreed with your customer.

  1. Describe surfaces and finish

    Under “Rooms / surfaces, number of coats and finish”, identify the rooms or surfaces, coats and finish. If these differ by line, explain that in each description.

  2. Match each quantity to its unit

    Use job for one complete job, hour for hourly work or linear ft for trim measured by length. Match the unit rate to that unit. Do not multiply by coats again when the agreed job price already includes them.

  3. Clarify materials and exclusions

    Under “Included / excluded work and supplied materials”, state who supplies the paint and whether wall preparation or repairs are included.

  4. Check the amounts and save a copy

    The PDF does not calculate or translate. Enter totals manually, subtract payments received once, and save the file. Close and reopen it to check the result.

Check the amounts on this page →
Handyman · hourly labor and materials

ONE JOB, WORKED THROUGH

Two hourly jobs. Materials listed separately.

How to describe the job

We adjusted a bedroom door and installed its hardware: 1 hour and 30 minutes. We assembled and wall-mounted a shelf: 2 hours and 15 minutes. The agreed labor rate is 65 dollars per hour. Supplied door hardware and wall anchors cost another 28 dollars. Painting and wall-finish repairs are excluded.

Illustrative example with fictional details. These amounts explain the calculation; they are not a price guide.

The English line items

Fictional invoice line items and amounts in US dollars
DescriptionQtyRateAmount
Bedroom door adjustment and hardware installation - labor per hour1.5$65.00$97.50
Shelf assembly and wall mounting - labor per hour2.25$65.00$146.25
Door hardware and wall anchors supplied1$28.00$28.00
Subtotal
$271.75
Illustrative tax · 8.25%
$22.42

Example total · USD$294.17

This example applies 8.25% tax to the whole subtotal. Confirm the tax rate and taxable items for your own job.

What to check before sharing

  1. Thirty minutes is half an hour

    1 hour 30 minutes is 1 + 30/60 = 1.5 hours. At $65 per hour, that line costs $97.50. Entering 1.30 as a decimal quantity would mean a different duration.

  2. Fifteen minutes is a quarter hour

    2 hours 15 minutes is 2 + 15/60 = 2.25 hours. Shelf assembly and mounting cost 2.25 × $65 = $146.25. Total labor is $243.75.

  3. Materials are not another labor hour

    The supplied hardware and anchors cost $28 once. The subtotal is $243.75 + $28 = $271.75. Painting and wall-finish repairs are excluded.

Check and change the amounts for this case →

DESCRIBE THE JOB IN YOUR LANGUAGE

From your description to English line items.

Speak or type the services, quantities and prices in English, Spanish or Portuguese. Invoicista prepares an English invoice for you to review before saving and sharing.

3 free invoices for life · No credit card